In accordance to our studies, the required works for the upgrading of two metal buildings with the aim of improving their structural performance have begun.

The first building of total area 2300 m2 is located in Malia, and it’s strengthening in the upgrading process was deemed necessary.

For the second metal building, located in the area of Giofiro in Heraklion, we conducted a study for the addition of a 185-m2 composite floor.

Gallery